CS Energy
Removed biological matter and suspended particulates upstream of an existing RO train at a QLD power plant. Multi-pass system extended downstream membrane life and lowered fouling pressure differential.
Four trials with Australian operators across energy, manufacturing, brewing and recreational facilities. Every metric independently conducted through ALS. Filterable below by sector and Purus model.
Removed biological matter and suspended particulates upstream of an existing RO train at a QLD power plant. Multi-pass system extended downstream membrane life and lowered fouling pressure differential.
Bacterial and suspended-solid fouling had collapsed head pressure across three water cooling systems at Evolve's plastic manufacturing facility. Blue Quest restored head and slashed OPEX inside week one. Chiller 2 followed.
A locally-based QLD micro-brewery's waste water cleaned to discharge spec and to livestock-drinking spec across three independent passes. Material monthly savings opportunity, no membrane degradation.
Surf Lakes International needed a scalable, chemical-free alternative for disinfecting water and managing algae outbreaks. A clarification + filtration trial improved results 70% over filtration-only and pointed to material CAPEX reduction at scale.
Tell us about your site or send us a sample to our Brisbane lab — we'll come back with sized output and indicative outcomes.